Skip navigation
(Access key: S).
Contact information.
Design a device with temperature control, salt extraction, and particle reduction capabilities to enhancing solubility of ELP(elastin-like polypeptides)aggregate while minimizing product loss

Prototype in testing with aggregated ELP substitute

Prototype in testing with soluble ELP substitute
prototype finished, presenting prototype
| Week | Reporting Period Beginning | Activities |
|---|---|---|
| 1 | September 8 | Form team, select project, assign roles, contact client, literature search, |
| 2 | September 15 | Research, literature search, create problem statement, meet with client |
| 3 | September 22 | Develop PDS |
| 4 | September 29 | Brainstorm |
| 5 | October 6 | Decide on three design alternatives |
| 6 | October 13 | Work on presentations |
| 7 | October 20 | Hand in written report including PDS; submit Design Notebooks for Advisor Review |
| 8 | October 27 | Decide on Final Design |
| 9 | November 3 | Work on Design |
| 10 | November 10 | Work on Design |
| 11 | November 17 | Work on Design |
| 12 | November 24 | Finalize Design |
| 13 | December 1 | Work on power point presentation |
| 14 | December 8 | Final poster present tation |
| 15 | December 15 | Work on Final Report, Final Meeting with Advisor |
| ELP Midsemester Presentation (Oct 19 2005, 222 kb) | |
| ELP Final Report (Dec 7 2005, 135 kb) | |
| ELP Midsemester Report (Dec 7 2005, 104 kb) | |
| ELP Final Presentation (Dec 7 2005, 711 kb) | |
| Project Design Specifications (Dec 7 2005, 25 kb) |