Project Overview

In order to accurately measure internal blood pressures, a properly calibrated pressure sensitive cardiovascular catheter may be used. Current techniques for calibrating the catheter are in question, which causes concern about the validity of the test results. This project aims to devise a testing system which more reliably calibrates and verifies the accuracy of the catheter in both atmospheric and internal bodily conditions.

Return to Contents


Project Status

Rose
Team members depicted left to right: Tony Wampole, Anita Zarebi, Danielle Ebben, Erik Yusko.



The project is in its infancy as the team is currently working on a specific definition and possible solutions to the project.

Progress Report Archive.

Return to Contents


Project Timeline

Week Reporting Period Beginning Activities
1 September 8 Assigned team roles. Met with client. Began literature research.
2 September 15 Researched Millar catheters and completed PDS.
3 September 22 Met with client to clarify current calibration procedures and requirements.
4 September 29 The team began barinstorming and developed a list of questions to ask various experts.
5 October 6 Developed 3 design ideas and are currently working on specifics involved with each design
6 October 13 We have narrowed designs to two alternatives. We are evaluating the components necessary for each design before proceeding.
7 October 20 Analyzed production costs of two designs.
8 October 27 Decide on a final design with client and finalize components.
9 November 3 In the process of finalizing components and parts.
10 November 10 We are currently ordering components.
11 November 17 Began to machine pieces need for constructing the chamber. And of course, all consumed massive amounts of tryptophan.
12 December 1 Concluding machine process. Rough draft of presenation/report.
13 December 8 Assembled prototype. Prepared final presenatation and rough draft of the final report.
14 December 15
15 December 22

Return to Contents


Presentations and Reports

pdf icon Midsemester Presentation (PDF) (Oct 27 2006, 142 kb)
ppt icon Midsemester Presentation (PPT) (Oct 27 2006, 409 kb)
ppt icon Midsemester (Client Version) (Nov 2 2006, 425 kb)
pdf icon Final Fall PDS (Dec 8 2006, 80 kb)
pdf icon Final Fall Poster Presentation (Dec 8 2006, 218 kb)
pdf icon Final Fall Semester Report (Dec 12 2006, 4755 kb)

Return to Contents


Contact Information

Project Team

Project Advisor and Client

Return to Contents


Valid XHTML 1.0!
Valid CSS!
Bobby WorldWide approved!
Labeled with the Internet Content Rating Association.
Owner: Willis Tompkins, Ph.D.
Author: Erik Yusko
Webmaster: Andrew L. Wentland
Created: Sep 21 2006
Content updated: Dec 12 2006

Back to navigation bar (Access Key: N)
Back to top.