Skip navigation
(Access key: S).
Contact information.
Develop a dose compliance monitor that would record (unknown to the client)
when (date and time) a topical ophthalmic medication was delivered.

From the left: Anita Zarebi, Arinne Lyman, Becky Koszalinski, Michael Alexander
We have completed the prototype and are now presenting our project.
| Week | Reporting Period Beginning | Activities |
|---|---|---|
| 1 | September 8 | Form team, contact client, assign team roles, set up client meeting |
| 2 | September 15 | Literature search, create problem statement, begin PDS |
| 3 | September 22 | PDS, brainstorming, begin developing designs |
| 4 | September 29 | Design research |
| 5 | October 6 | Design research |
| 6 | October 13 | Work on mid-semester presentation paper and presentation (oral and power point) |
| 7 | October 20 | Mid-semester presentation |
| 8 | October 27 | Work on final design (i.e. develop a prototype, testing, etc) |
| 9 | November 3 | Continue working on final design |
| 10 | November 10 | Work on design |
| 11 | November 17 | Work on design |
| 12 | November 24 | Continue working on design, start working on presentation |
| 13 | December 1 | Prepare final presentation and paper |
| 14 | December 8 | Final poster presentation |
| 15 | December 15 | Hand in report and notebook |
| Mid Semester Powerpoint (Oct 14 2005, 374 kb) | |
| Mid Semester Paper (Dec 9 2005, 306 kb) | |
| Final Poster (Dec 9 2005, 919 kb) | |
| Final Paper (Dec 9 2005, 306 kb) |