From left: Cullen Rotroff (Team Leader), Kailey Feyereisen (Communicator), Malini Soundarrajan (BWIG), & Tyler Allee (BSAC)
Our client wants us to develop an alternative method of drug delivery. The product should utilize micro-fluidics to deliver a constant flow rate between ten and fifty micro liters per hour with minimal error or fluctuation for no less than eight consecutive hours. The design requirements are to build a , small, disposable, light, and inexpensive pump that is comfortable and unnoticeable when worn.
Final Design of Protoype

Bottom of Container (Green = Insulin Reservoir)

Making protoype, preparing for poster presentation, completing written report
| Week | Reporting Period Beginning | Activities |
|---|---|---|
| 1 | September 8 | Assemble team and assign duties, contact client for a meeting, begin researching background information and previously done projects |
| 2 | September 15 | Write problem statement, write PDS, brainstorm projects individually and report ideas to each other |
| 3 | September 22 | Research literature on hydrogels and mechanisms fror drug pumps |
| 4 | September 29 | Develop three major ideas, work on mid-semster presentation |
| 5 | October 6 | Prepare written presentation and start on power point presentation, refine three main ideas |
| 6 | October 13 | Mid-Semester Presentation, assign sections of mid-semster report to team members to complete |
| 7 | October 20 | Meet with Prof. Puccinelli to decide on how to produce the hydrogel, determine costs, determine materials necessary to produce hydrogel, order materials |
| 8 | October 27 | Finalize dimensions of hydrogel, and the case that encloses hydrogel, start testing electrical response of hydrogel, look into rapid protoyping machine |
| 9 | November 3 | Prepare and test hydrogels, order anode and cathode |
| 10 | November 10 | Prepare/testhydrogels, look into rapid protoyping, designing PDMS membrane |
| 11 | November 17 | Prepare poster, build protoype |
| 12 | November 24 | Print poster, finish building prototype, practice presentation |
| 13 | December 1 | Work on final report |
| 14 | December 8 | Poster Presentation |
| 15 | December 15 | Final meeting with advisor |
| PDS (Oct 5 2005, 22 kb) | |
| Mid-semester Presentation (Oct 14 2005, 328 kb) | |
| Mid-semester Report (Oct 19 2005, 572 kb) | |
| Poster (Dec 6 2005, 180 kb) | |
| Final Report (Dec 7 2005, 559 kb) |