Project Overview

Creating a chamber to monitor the Carbon Dioxide concentration and maintain a steady 5% CO2 concentration.

Return to Contents


Project Status

We are constructing an L-shaped box to accomodate the condensor of the microscope, and finding electronics to control the CO2 flow as well as the concentration. We have divided into two sub-groups, the imaging chamber and the control circuit.



Left to Right:David, Bryan, Jon, Matt, Dan



Our box in its home environment - at the microscope

Progress Report Archive.

Return to Contents


Project Timeline

Week Reporting Period Beginning Activities
1 September 8 Background research on topic
2 September 15 Client Meeting, Discuss Specifications
3 September 22 Met with Grad student, revised design specifications
4 September 29 Researched new design specifications
5 October 6 Chose Design #1, Creation of a Chamber for CO2 level maintenance
6 October 13 Began further research
7 October 20 Divided into 2 groups - the chamber & circuit
8 October 27 Performed research within groups on components
9 November 3 Research CO2 Sensors
10 November 10 Order Components
11 November 17 Construct Circuit
12 December 1 Build Imaging Box
13 December 8 Poster Session & Presentations
14 December 15 Finish Paper
15 December 22 Final Meeting

Return to Contents


Presentations and Reports

pdf icon Product Design Specifications (Oct 13 2006, 15 kb)
ppt icon Midsemester Powerpoint (Oct 20 2006, 1001 kb)
pdf icon Midsemester Paper (Nov 3 2006, 314 kb)
pdf icon Final Paper (Dec 13 2006, 517 kb)
ppt icon Poster Slides (Dec 13 2006, 1303 kb)

Return to Contents


Contact Information

Project Team

Project Advisor and Client

Return to Contents


Valid XHTML 1.0!
Valid CSS!
Bobby WorldWide approved!
Labeled with the Internet Content Rating Association.
Owner: Willis Tompkins, Ph.D.
Author: Dan Jonovic
Webmaster: Andrew L. Wentland
Created: Sep 29 2006
Content updated: Dec 13 2006

Back to navigation bar (Access Key: N)
Back to top.