Biomedical Engineering Design Projects

Temperature Controller and Solution Switch for Patch Clamp

Skip navigation (Access key: S)
Contact information


Table of Contents


Project Overview

Our project goal is to design an automated method for delivering six to eight different solutions to a patch clamp. Also, we will design a automated temperature controller that can read the solution temperature and change it quickly.

Our project team.

Return to Contents


Project Status

We have completed our device, and have presented it to our advisor and client. There are a few problems left that we are currently working on. When they are solved, the device will be implemented in the client’s lab.

Progress Report Archive.

Return to Contents


Project Timeline

Week Reporting Period Beginning Activities
1 January 23 We selected our project and exchanged contact info. We contacted our client and set up a meeting.
2 January 30 We did some preliminary background research, and then met with our client and discussed the specifications for the project.
3 February 6 We began to develop our PDS report, continued research and began brainstorming.
4 February 13 We completed our PDS report and continued brainstroming.
5 February 20 We met with our client and discussed the PDS and the overall design.
6 February 27 We continued research and began evaluating possible designs.
7 March 5 We prepared our presentation, and presented our problem and design.
8 March 12 We wrote our mid-semester report detailing our design alternatives and our chosen design.
9 March 19 We ordered the parts necessary for our preliminary testing, and searched for some of the less important parts.
10 March 26 We met with our client and discussed the software being used in the system.
11 April 2 We recieved the parts and began testing.
12 April 9 We continued testing and began to determine the details of the assembly of the parts.
13 April 16 We began to build the box which contains the system, and discussed the final presentation.
14 April 23 We completed our constriction of the device, and prepared for our final presentation.
15 April 30 We presented the design and device to our advisor and client, and we completed our final report.

Return to Contents


Presentations and Reports

doc icon Solution Switch PDS Report (Feb 20 2004, 32 kb)
ppt icon Mid-Semester Presentation (Mar 5 2004, 319 kb)
doc icon Mid-Semester Report (Mar 11 2004, 518 kb)
ppt icon Final Presentation (May 4 2004, 364 kb)
doc icon Final Report (May 4 2004, 703 kb)

Return to Contents


Contact Information

Project Team

Project Advisor and Client

Return to Contents


Valid XHTML 1.0!
Valid CSS!
Bobby WorldWide approved!
Labeled with the Internet Content Rating Association.
Owner: Willis Tompkins, Ph.D.
Author: Erik Bieging
Created: Feb 14 2004
Content updated: May 4 2004

Back to navigation bar (Access Key: N)
Back to top.