Biomedical Engineering Design Projects

augmentative communication device

Skip navigation (Access key: S)
Contact information


Table of Contents


Project Overview

Team Picture

From left to right: Steve Wyche, Prachi Agarwal, Brian Mogen, Erin Devine

Return to Contents


Project Status

Progress Report Archive.

Return to Contents


Project Timeline

Week Reporting Period Beginning Activities
1 January 23 Assigned team roles and background research
2 January 30 Background research, tried meeting with client
3 February 6 Met with the client, brainstorming sessions and made PDS
4 February 13 Met with client, further brainstorming and made design matrix
5 February 20 Met with client,decided on final design
6 February 27 Ordered parts and prepared for midsemester presentations
7 March 6 Midsemester presentation, medsemester report and peer reviews.
8 March 13 Spring Break
9 March 20 Setting up of our prototype machine
10 March 27 Testing of prototype
11 April 3 resesearch on microphones and type of tubing materials
12 April 10 Further Testing, Finalizing on the tubing
13 April 17 Final testing, fixing up final device
14 April 24 Poster preparation, client meeting for future work
15 May 1 Final presentation, Final report

Return to Contents


Presentations and Reports

pdf icon PDS (Feb 18 2009, 78 kb)
ppt icon Mid semester presentation (Mar 3 2009, 1536 kb)
pdf icon Updated PDS (Mar 10 2009, 24 kb)
pdf icon mid semester report (Mar 11 2009, 225 kb)
ppt icon Poster (Apr 30 2009, 9525 kb)
pdf icon Final PDS (May 7 2009, 24 kb)
pdf icon Final Report (May 7 2009, 1121 kb)

Return to Contents


Contact Information

Project Team

Project Advisor and Client

Return to Contents


Valid XHTML 1.0!
Valid CSS!
Bobby WorldWide approved!
Labeled with the Internet Content Rating Association.
Owner: Willis Tompkins, Ph.D.
Author: Prachi Agarwal
Webmaster: Andrew L. Wentland
Created: Feb 7 2009
Content updated: May 7 2009

Back to navigation bar (Access Key: N)
Back to top.