Skip navigation
(Access key: S).
Contact information.
Medication errors remain a significant problem in health care because patients often fail to comply with simple medication regime. Consequently, there is a need for a device to assist with the timely and appropriate dispensing of medication to improve patient compliance. The device should be event specific and provide clear visual instructions.
We have completed our final poster presentation and it can be viewed below. The final report will be posted by the end of next week. Here is a picture of our chosen design:

| Week | Reporting Period Beginning | Activities |
|---|---|---|
| 1 | January 24 | Choose a project and set up a client meeting. Meet with client to discuss the project |
| 2 | January 31 | Research about drug dispensing products and patents |
| 3 | February 7 | Continue research and write the PDS (Product Design Specifications) |
| 4 | February 14 | Contact the UW Pharmacy department faculty and interview with pharmacists to help define the design specifications |
| 5 | February 21 | Begin brainstorming design ideas |
| 6 | February 28 | Brainstorm design ideas, continue writing the PDS, and begin mid-semester report and presentation. |
| 7 | March 7 | Finalize design solution and finish midterm report and presentation |
| 8 | March 14 | Mid-semester presention and hand in report. |
| 9 | March 21 | Work on final design (i.e. Build protoype, testing, etc) |
| 10 | March 28 | Work on final design (i.e. Build protoype, testing, etc) |
| 11 | April 4 | Work on final design (i.e. Build protoype, testing, etc) |
| 12 | April 11 | Work on final design (i.e. Build protoype, testing, etc). Begin preparation of final presentation and report. |
| 13 | April 18 | Finish building prototype, performing tests. Prepare for final presentation. |
| 14 | April 25 | Give poster presentation. Finish the final report. |
| 15 | May 2 | Submit final report. |
| Midsemester Report (Mar 14 2003, 474 kb) | |
| Midterm Presentation (Mar 14 2003, 1614 kb) | |
| Product Design Specifications (PDS) (May 7 2003, 17 kb) | |
| Final Poster Presentation (May 7 2003, 1128 kb) | |
| Final Report (May 7 2003, 4675 kb) |