To find a process to prepare mouse bone for nanoindentation testing. Three factors must be looked at: The bone must be placed in a mold to make future work easier, the bone must be cut into 1mm sections, and the bone must have a smooth surface with variations less than 3um.
The nanoindentation project team has currently finished the designing stage of the design process. The eight member team has designed a process for putting the bone into a mold, cutting, and sanding the surface of the bone. This design team has also designed a device to hold the bone while sanding.
| Date | Task |
| 9/6 - 9/13 | Form team, select project, contact client |
| 9/13 - 9/19 | Literature search, meet with client |
| 9/20 - 9/26 | Develop understanding of project, develop PDS, brainstorm |
| 9/27 - 10/3 | Brainstorm, evaluate ideas, work on rough draft of report |
| 10/4 - 10/10 | Work on presentation and report, advisor review notebook |
| 10/11 - 10/17 | Work on mid-semester presentation and report, have rough draft complete |
| 10/18 | Mid-semester presentation, hand in report |
| 10/15 - 10/31 | Form large team, evaluate ideas, decide final design |
| 11/1 - 11/07 | Define needed modifications to fit holding device in Hysitron indenting machine |
| 11/08 - 11/14 | Work on final design that will have needed modifications |
| 11/15 - 11/21 | work on final design, outline main ideas for final paper, modify PDS |
| 11/22 - 11/28 | Work on final design, work on final paper |
| 11/29 - 12/5 | Thanksgiving Break |
| 12/6 - 12/12 | Work on final design, work on final paper, work on poster presentation |
| 12/13 | Poster presentation, turn in final paper |
| 12/16 - 12/20 | Final meeting with advisor |
Project Advisor and Client