Project Overview

A photograph of the design team. The members are (from left to right): 
Adam Pala (BWIG), 
Steve Wyche (Communications), 
Colleen Farrell (BSAC), 
Jeremy Schaefer (Team Leader).

A photograph of the design team. The members are (from left to right): Adam Pala (BWIG), Steve Wyche (Communications), Colleen Farrell (BSAC), Jeremy Schaefer (Team Leader)

Return to Contents


Project Status

The team has officially completed this semester’s worth of work on the design of the protoype (as of 10:00 AM, Friday December 12, 2008).

Progress Report Archive.

Return to Contents


Project Timeline

Week Reporting Period Beginning Activities
1 September 5 The group conducts preliminary research regarding the design topic and holds a group meeting on Wednesday, September 10, 2008.
2 September 12 The group meets with both the advisor and client on Monday, September 15, 2008. The group also drafts a PDS.
3 September 19 The group begins to brainstorm potential design plans, having drafted a tentative PDS.
4 September 26 The group prepares for the midsemester presentation and report.
5 October 3 The group continues to prepare its midsemester presentation and report.
6 October 10 The group finishes its midsemester report and prepares to start constructing the device.
7 October 17 Having completed its presentation, the group is contacting the client and preparing to construct the device and programming the computer interface.
8 October 24 The group is contacting the client regarding funding and working on the MATLAB user interface, as it prepares to construct the device.
9 October 31 The group is looking for passive infrared cameras on campus while complications with funding pend resolution.
10 November 7 Having received the infrared cameras which were ordered, the group prepares to collect data.
11 November 14 The group has begun testing data point collection and is currently standardizing the procedure.
12 November 21 The group is working on the final design in preparation for the poster session on Friday December 5, 2008.
13 November 28 The group has completed its final presentation (successfully!) and is now working on completing the final deliverables (due Friday December 12, 2008).
14 December 5
15 December 12

Return to Contents


Presentations and Reports

pdf icon Midsemester Presentation (PDF Format) (Oct 17 2008, 276 kb)
ppt icon Midsemester Presentation (PowerPoint Format) (Oct 17 2008, 567 kb)
pdf icon Midsemester Report (Oct 22 2008, 1276 kb)
pdf icon Final Presentation Poster (Dec 5 2008, 582 kb)
pdf icon Final Presentation - Addendum to Poster (Regarding Testing) (Dec 5 2008, 78 kb)
pdf icon Product Design Specifications (PDS) (Dec 12 2008, 12 kb)
pdf icon Final Report (Dec 12 2008, 1065 kb)

Return to Contents


Contact Information

Project Team

Project Advisor and Client

Return to Contents


Valid XHTML 1.0!
Valid CSS!
Bobby WorldWide approved!
Labeled with the Internet Content Rating Association.
Owner: Willis Tompkins, Ph.D.
Author: Adam Pala
Webmaster: Andrew L. Wentland
Created: Sep 14 2008
Content updated: Dec 12 2008

Back to navigation bar (Access Key: N)
Back to top.