To build a safe system for infecting animals that range in size from 40-50 gm up to 1 kg (e.g., for infecting mice, rats, and rabbits). The system should have built in all the necessary safety measures to prevent the escape of infectious materials (especially those of Biological Safety Level 3) from the infection chamber to the surrounding environment.
The Current Inhalation System:
Materials for Inhalation Prototype:

Construction of Prototype:
Construction Complete. Presentation Complete. Client is very pleased with final product. Final Report, PDS, and Design Drawings Complete.
| Week | Reporting Period Beginning | Activities |
|---|---|---|
| 1 | September 9 | Form Teams, Select Project, Contact Client |
| 2 | September 16 | Literature Search; Meet with Client |
| 3 | September 23 | Research Project and Develop PDS |
| 4 | September 30 | Brainstorm |
| 5 | October 7 | Work on Presentations |
| 6 | October 14 | Written Reports Due including PDS; Project Design Notebooks Due |
| 7 | October 21 | Decide on Final Design |
| 8 | October 28 | Work on Design |
| 9 | November 4 | Work on Design |
| 10 | November 11 | Work on Design |
| 11 | November 18 | Work on Design |
| 12 | November 25 | Work on Design |
| 13 | December 2 | Thanksgiving |
| 14 | December 9 | Final Poster Presentations |
| 15 | December 16 | Final Report and Notebook Due; Final Meeting with Advisor |
| Mid-Semester Presentation Group 1 (Oct 10 2003, 419 kb) | |
| Mid-Semester Presentation Group 2 (Oct 10 2003, 345 kb) | |
| Mid-Semester Presentation Group 3 (Oct 10 2003, 208 kb) | |
| Final Poster Presentation 12/5/03 (Dec 6 2003, 3172 kb) | |
| Final Design Report (Dec 7 2003, 1673 kb) | |
| Final Design Report Appendix: Final PDS, Design Matrix, & Design Drawings (Dec 7 2003, 1658 kb) |