To validate a pre-existing tensile creep testing device and associated environmental chamber designed and fabricated by previous biomedical engineering teams at the University of Wisconsin-Madison, in preparation of a study to assess the tesnsile creep properties of IPNs of interest. To develp a method to make robust and consistent IPN samples to test that meet dimensions specified in ASTM D638.
Team Members: Christy Palmer, Megan Toth, and Kelly Williams
Client: Weiyuan John Kao
Advisor: Glennys Mensing
The tensile creep testing device has been validated and three IPN samples have been tested for three hours with a load of 5 grams each. Three latex samples have also been tested for three hours with a load of 5 grams each. For future work, further tests will be conducted on IPN and latex samples.
| Week | Reporting Period Beginning | Activities |
|---|---|---|
| 1 | September 9 | Transition project, define team roles, meet with client |
| 2 | September 16 | Research creep models, ASTM methods, reference materials |
| 3 | September 23 | Research reference materials, temperature and pH regulation, and force verification, verify specimen dimensions, select reference material |
| 4 | September 30 | Design how to implement selected temperature and pH controls. Order and receive parts, assign sections of mid-semester paper, write test method |
| 5 | October 7 | Prepare mid-semester paper and presentation, have teflon molds machined |
| 6 | October 14 | Finish mid-semester paper, water-proof system, make IPNs, force verification |
| 7 | October 21 | Write up protocol to validate testing system |
| 8 | October 28 | Test reference material/validate testing system |
| 9 | November 4 | Test reference material/validate testing system |
| 10 | November 11 | Test reference material/validate testing system |
| 11 | November 18 | Test reference material/validate testing system |
| 12 | November 25 | Test reference material/validate testing system |
| 13 | December 2 | Test reference material/validate testing system |
| 14 | December 9 | Prepare poster presentation and final paper |
| 15 | December 16 | Finish final paper, meet with advisor |
| Mid-semester Presentation (Oct 15 2003, 539 kb) | |
| Mid-semester Report (Oct 16 2003, 980 kb) | |
| Poster Presentation (Dec 5 2003, 1321 kb) | |
| Final Semester Report (Dec 8 2003, 1001 kb) |