Progress Report 6
October 17, 2001


Project Title: Mouth Guard for Prevention of Bruxism
Team Members: Matt Harris, Tracy Stefonek
Client: Michael Conforti
Advisor: John G. Webster
Date: 10/10/01 - 10/17/01


Problem Statement: The goal of this project is to design a mouth guard that will detect the teeth grinding of a patient during sleep. The device should provide a gentle stimulus to the patient, causing the individual to unclench or stop grinding his/her teeth.

Restatement of Team Goals:

1. Meet in small group (Matt and Tracy) and discuss the Product Design Specification (PDS), the Preliminary Design Report, and the Oral Presentation that are coming up.

2. Meet in large group to get feedback on rough draft of Preliminary Design Report.

3. Continue design process in partners.
a) Continue research/brainstorming on pressure switches, miniature
electrodes, mouth guards, bruxism
b) Continue to develop PDS
c) Collect and test materials, such as cheap football mouth guard and TENS unit
d) Continue to study reading material from client and advisor
e) Complete final draft of Preliminary Design Report and PDS
f) Prepare Midsemester presentation
g) Practice Midsemester presentation


Summary of Team Accomplishments:

1. Approximately half the group met and exchanged rough drafts of the preliminary design report, Prof. Webster, Friday 10/12/01 at noon for 1 hour.
2. Met as a small group meeting (Matt and Tracy) Friday 10/12/01 at 1pm for 1 hour, then met on a daily basis between classes Mon 10/15 thru Wed 10/17 to work on report and presentation.


Summary of Individual Accomplishments:

Matt

1. Attended a BSAC meeting
2. Research
3. Worked on Power Point Presentation
4. Worked on Preliminary Design Report


Tracy

1. Research
2. Continued working on preliminary PDS
3. Picked up NTI device from Dr. Clark at Total Care Dental (borrowed for presentation)
4. Worked on Power Point Presentation
5. Worked on Preliminary Design Report


Statement of Team Goals:

1. Meet in small group (Matt and Tracy) and finalize the Product Design Specification (PDS), the Preliminary Design Report, and to practice the Oral Presentation that are coming up.

2. Meet in large group to discuss final design choice.

3. Continue design process as a large group:

a) Decide on final design
b) Continue research/brainstorming on pressure switches, miniature
electrodes
c) Continue to develop PDS
d) Collect and test materials, such as cheap football mouth guard and TENS unit

Project Schedule:

10/11 - 10/18 Finalize project solution, prepare mid-semester presentation, paper,
and PDS
10/19 Mid-semester presentations
10/19 - 10/26 Meet as large group of seven and decide on final design
10/27 - 11/29 Work on final design, PDS, prototype/s, testing of prototype/s
11/30 - 12/13 Final presentation and paper
12/14 Final presentations
12/17 - 12/23 Final meeting with advisor

Difficulties: none

Activities:

Matt: Group meeting on Friday - 1 hour
Small group meetings - 10 hours
Preliminary Report-2 hours
Power Point Presentation: 4 hours
PDS: 1.5 hours
General Research: 2 hours
BSAC Meeting: 1 hour


Tracy: Group meeting on Friday - 1 hour
Small group meetings - 10 hours
Progress Report-0.5 hour
PDS-1 hour
Preliminary Report-10 hours
Power Point Presentation: 4 hours


Valid HTML 4.01!
Valid CSS!
Level Double-A conformance icon, W3C-WAI Web Content Accessibility Guidelines 1.0
Approved by Bobby v3.2!
Owner: Willis Tompkins, Ph.D.
Author: Carla Maas
Content updated: December 3, 2001
Page updated: August 4, 2003, B.J.

Back to navigation (Access Key: N)
Back to top.