Progress Report for: Variable
Stiffness Guidewire for catheters
Project Members:
Client: Dr. Victor Houghton
Advisor: Kreg Gruben
Team Members:
Kristi Hinner
Jeremy O’Brien
Brian Asti
John Puccinelli
Tom Pearce
Erik Birkeneder
Hart Moss
Nick Vandehey
Period: 10-10to 10-17
Problem Statement: To design a guide wire of variable stiffness to be
used in a catheterization procedure and in situations where the conventional
guide wires fail. The wire must be of correct stiffness in order to
reach the correct point in the vessel, but also provide enough force for the
catheter to follow into the vessel.
Restatement of Team Goals:
1. Work in small teams to establish potential designs
2. Evaluate designs
3. Prepare Mid-Semester Presentation and Paper
Summary of Accomplishments:
-Created draft of Mid-semester Report
-Revised draft
-Refined Brainstormed ideas
Statement of Team Goals:
-Prepare Mid-Semester Presentation
Project Schedule:
Week 1 (9/7- 9/11): Choose projects and form design teams; choose partners and
team roles; contact client and set up client meeting.
Week 2 (9/12- 9/18): Discuss PDS with group; begin first design steps with in
pairs.
Week 3 (9/19 - 9/25): Meet with client; Background information on project;
brainstorming; work on PDS.
Week 4 (9/26 - 10/2): Brainstorming; design ideas; begin working on
presentation; PDS.
Week 5 (10/3 - 10/9): Brainstorming, work on presentations.
Week 6 (10/10 - 10/16): Work on presentations.
OCTOBER 19 - MIDSEMESTER PRESENTATIONS
Week 7 (10/17 - 10/23):
Week 8 (10/24 - 10/30):
Week 9 (10/31 - 11/6):
Week 10 (11/7 11/13):
Week 11 (11/14 11/20):
Week 12 (11/21 11/27):
Week 13 (11/28 12/4):
Week 14 (12/5 12/11):
Difficulties: none this week
Activities:
This week:
Brian: 1.5 hr mid-semester report work
total: 7.2 hrs
Tom: 1.5 hr mid-semester report work
1.5 hr research on ideas, materials
total 8.5 hrs