Project Title: Variable Stiffness Guidewire for catheters

 

Client: Dr. Victor Houghton

 

Team Members: Kristi Hinner, Erik Birkeneder, Jeremy O’Brien, Hart Moss, Brian Asti, Nick Vandehey, John Puccinelli, Tom Pearce

 

Date: 11/7  – 11/13

 

Problem Statement:  To design a guide wire of variable stiffness to be used in a catheterization procedure and in situations where the conventional guide wires fail.  The wire must be of correct stiffness in order to reach the correct point in the vessel, but also provide enough force for the catheter to follow into the vessel. 

 

Restatement of Team Goals:

1.     Detailed research on bead/ vacuum ideas

2.     Set-up outline for paper/ schedule for paper completion

3.     Look into some manufacturing details

 

Summary of Accomplishments:

1.     Research on bead/vacuum ideas

2.     Began search for manufacturing details

3.     Began poster ideas

 

Statement of Team Goals:

1.     More research on ideas

2.     Begin PDS revision

3.     Meeting to update client

 

Project Schedule:

Week 1 (9/7- 9/11): Choose projects and form design teams; choose partners and team roles; contact client and set up client meeting.

Week 2 (9/12- 9/18):  Meet with client; discuss PDS with group; begin first design steps with in pairs.

Week 3 (9/19 - 9/25): Background information on project; brainstorming; work on PDS.

Week 4 (9/26 - 10/2): Brainstorming; design ideas; begin working on presentation; PDS.

Week 5 (10/3 - 10/9): Brainstorming; design ideas; begin working on presentation; PDS.

Week 6 (10/15 - 10/16): Work on presentations; PDS. 

OCTOBER 19 - MIDSEMESTER PRESENTATIONS

Week 7 (10/17 - 10/23):  Break

Week 8 (10/24 - 10/30):  Evaluate final designs; further research; contact client.

Week 9 (10/31 - 11/6):  Pick final design; contact client.

Week 10 (11/7 – 11/13):  Meet with client; research and development.

Week 11 (11/14 – 11/20): Research and development.

Week 12 (11/21 - 11/27): Research and development; begin work on presentation; PDS.

Week 13 (11/28 – 12/4): Research and development; work on presentation and PDS.

Week 14 (12/5 – 12/11):FINAL PRESENTATION

 

New Developments:

**This section will be used to inform the client/advisor/large group about the latest progress of the 3 subgroups.

Guidewire:

Progress has been made on a device to apply suction to the guidewire.  The

device so far consists of a 10 mL syringe (although any size is compatible

with the device) connected to a 3-way stopcock.  The guidewire can be

attached to the stopcock by a custom made PDMS gasket which provides the

seal necessary for the vacuum to be applied.  After the pressure is

applied, the stopcock can be closed so that the syringe can be removed and

the vacuum is isolated in the guidewire-stopcock complex.

 

Manufacturing:

None this week

 

Paper:

None this week

 

 

Difficulties:

No Difficulties

 

Activities:

This week:

Kristi (1.75)- research; begin poster organization brainstorming; progress report 8

Erik (1 hr)- research

Jeremy (hr)-

Nick (hr)-

Tom (5 hrs)- research and development

John (hrs) –

Hart (hrs)-

Brian (hrs) –

*Hours not reported will be added to next weeks progress report.

 

Totals to-date :

Kristi: 24 hrs

Erik: 18.25 hrs

Jeremy: 29 hrs

Nick: 29.5 hrs

Tom 22.5 hrs

John: 22 hrs

Hart: 21.5 hrs

Brian: 19.2 hrs