Archive from the Spring 2001 semester.

System for pH Measurement Inside An Incubator

Skip navigation (Alt + s).
Contact information.


 

Table of Contents


Return to Table of Contents

Project Overview

Project Statement: To design a device that can constantly monitor the pH levels of the bathing medium for bovine embryos inside an incubator. This device cannot alter the incubator in any way. It must also be able to accurately measure the pH within tenths of a pH level.

Different Components of the Project:

Product Design Specification:

Version 4 (April 22, 2001)
Version 3 (April 15, 2001)
Version 2 (April 1, 2001)
Version 1 (February 13, 2001)



Return to Table of Contents

Project Status

Our probe is here, and our stand is built. If you would like to see the progress through out the semester, the following are the group's progress reports:

GROUP PROGRESS REPORTS (Each about 10 KB, PDF files):

Progress Report 1 (1-30-01)
Progress Report 2 (2-07-01)
Progress Report 3 (2-13-01)
Progress Report 4 (2-21-01)
Progress Report 5 (2-28-01)
Progress Report 6 (3-06-01)
Progress Report 7 (3-21-01)
Progress Report 8 (3-28-01)
Progress Report 9 (4-04-01)
Progress Report 10 (4-11-01)
Progress Report 11 (4-18-01)
Progress Report 12 (4-25-01)
Progress Report 13 (5-02-01)

 


Return to Table of Contents

Project Timeline

Project Schedule: Week Date Design Activities

Week 1 (1/31) Meet with client

Week 2 (2/2 - 2/9) Gather research

Week 3 (2/9 - 2/16) Gather more research and ask client questions

Week 4 (2/16 - 2/23) Come up with ideas for design and write outline

Week 5 (2/23 - 3/2) Complete the Report and Slides for the Presentation

Week 6 (3/2 - 3/9) Meet with the client and discuss our design ideas

Week 7 (3/9 - 3/23) Break into small groups to begin final design

Week 8 (3/23 - 3/30) Meet with client, form list of needed items and break into small groups for the building phase

Week 9 (3/30 - 4/6) Design stand, begin writing paper, talk to companies about ordering parts

Week 10 (April 6) Stand group continued to design stand, companies contacted, paper started

Week 11 (April 13) Stand group finalized the design, talked to Bill at the shop. Client meeting to finalize the ordering of the probe. Paper group started getting specifics from the different groups, researching ethics.

Week 12 (April 20) NO CLASS - ENGINEERING EXPO; continued individual work in groups.

Week 13 (April 27) Finalize design, building stand, initial testing, put together slides for presentation.

Week 14 (May 4) FINAL PRESENTATIONS; PAPER DUE

Week 15 (May 11) Final Meeting with Advisor: Friday 12:30pm

Week 16 (May 14-18) DONE!


Return to Table of Contents

Presentations and Reports

Final Presentation Slides [zipped Powerpoint 2000, 510 kB]

Final Paper [Adobe PDF, 1.5 MB]

-----------------------------------------------

Midsemester Presentation Slides [zipped Powerpoint 2000, 136 kB]

Midsemester Paper [Adobe PDF, 84 kB]

 


Return to Table of Contents

Contact Information

Group Members:

Team Leader: Mike Swift
Communication Leader: Ryan Porter
Webmaster: Sara Alford
BSAC Representative: Gabriel Martinez-Diaz

Byoung Choe
Steve Huffacker
Laura Wing
Kristi Hinner
Carla Maas

Client:
Theresa Duello
Associate Professor
Obstetrics and Gynecology
5240 Medical Sciences Center
tmduello@facstaff.wisc.edu

Advisor:
Nimmi Ramanujam
278 CAE
nimmi@engr.wisc.edu

This page complies with CSS and HTML 4.01 Transitional standards as set forth by the W3C. Further, this page conforms to W3C's "Web Content Accessibility Guidelines 1.0", available at http://www.w3.org/TR/1999/WAI-WEBCONTENT-19990505, level Double-A.

Valid CSS! Valid HTML 4.01! Approved by Bobby v3.2! Level Double-A conformance icon, 
          W3C-WAI Web Content Accessibility Guidelines 1.0

Owner: Willis Tompkins, Ph.D.
Author: Sara Alford.
Content updated: May 10, 2001.
Page updated: April 10, 2002, B.J.

Back to navigation bar (Alt + n).
Back to top.