IE 415 Lab Schedule, Spring 2000

Week

Date

Day

Location

Topic

Assignments

1

31-Jan

02-Feb

M

W

405Wendt

Introduction & Project Overview

2

07-Feb

09-Feb

M

W

180ME

Demonstration of Basic Machines

Machine ID. exercise to be submitted at the end of session(I)

3

14-Feb

16-Feb

M

W

405Wendt

Introduction to NC Machines

(Read Lab Manual, pages 1.1 –1 to 1.1 – 15)

4

21-Feb

23-Feb

M

W

405Wendt

ESPRIT – Design

(Read ESPRIT–Notes)

G/M Code HW due (I)

(Refer Homework Assignments)

5

28-Feb

01-Mar

M

W

405Wendt

ESPRIT - Tool Paths

(Read ESPRIT–Notes)

ESPRIT – Design HW due (I)

(Refer Homework Assignments)

6

06-Mar

08-Mar

M

W

180 ME

Introduction to Robotics

(Read Lab Manual, Section 3: Robotics)

ESPRIT – Tool Paths HW due (I)

(Refer Homework Assignments)

7

20-Mar

22-Mar

M

W

180 ME

G/M Code Machining

8

27-Mar

29-Mar

M

W

180 ME

Introduction to CMM

(Read Lab Manual, Section 4: Inspection & CMM)

CMM Group Exercise to be submitted at the end of lab(G)

9

03-Apr

05-Apr

M

W

180 ME

ESPIRIT Milling (Holder)

Report on G/M code Machining due (G)

10

10-Apr

12-Apr

M

W

180 ME

ESPRIT Turning (Inserts)

11

17-Apr

19-Apr

M

W

180 ME

Cell Demonstration

Report on ESPRIT machining due(G)

(Refer Homework Assignments)

12

24-Apr

26-Apr

M

W

180 ME

Group 1: Project assembly

Group 2: Inspection

13

01-May

03-May

M

W

180 ME

Group 1: Project assembly

Group 2: Inspection

Group 1: Assembly rpt due (G)

Group 2: Inspection rpt due (G)

Final Report is to be submitted by 08th May. Group 1 and Group 2 should submit the inspection report and the assembly report respectively along with the final report.

(I) è Individual Assignments (G) è Group Assignments