IE 415 Lab Schedule, Spring 2000
|
Week |
Date |
Day |
Location |
Topic |
Assignments |
|
1 |
31-Jan 02-Feb |
M W |
405Wendt |
Introduction & Project Overview |
|
|
2 |
07-Feb 09-Feb |
M W |
180ME |
Demonstration of Basic Machines |
Machine ID. exercise to be submitted at the end of session(I) |
|
3 |
14-Feb 16-Feb |
M W |
405Wendt |
Introduction to NC Machines (Read Lab Manual, pages 1.1 –1 to 1.1 – 15) |
|
|
4 |
21-Feb 23-Feb |
M W |
405Wendt |
ESPRIT – Design (Read ESPRIT–Notes) |
G/M Code HW due (I) (Refer Homework Assignments) |
|
5 |
28-Feb 01-Mar |
M W |
405Wendt |
ESPRIT - Tool Paths (Read ESPRIT–Notes) |
ESPRIT – Design HW due (I) (Refer Homework Assignments) |
|
6 |
06-Mar 08-Mar |
M W |
180 ME |
Introduction to Robotics (Read Lab Manual, Section 3: Robotics) |
ESPRIT – Tool Paths HW due (I) (Refer Homework Assignments) |
|
7 |
20-Mar 22-Mar |
M W |
180 ME |
G/M Code Machining |
|
|
8 |
27-Mar 29-Mar |
M W |
180 ME |
Introduction to CMM (Read Lab Manual, Section 4: Inspection & CMM) |
CMM Group Exercise to be submitted at the end of lab(G) |
|
9 |
03-Apr 05-Apr |
M W |
180 ME |
ESPIRIT Milling (Holder) |
Report on G/M code Machining due (G) |
|
10 |
10-Apr 12-Apr |
M W |
180 ME |
ESPRIT Turning (Inserts) |
|
|
11 |
17-Apr 19-Apr |
M W |
180 ME |
Cell Demonstration |
Report on ESPRIT machining due(G) (Refer Homework Assignments) |
|
12 |
24-Apr 26-Apr |
M W |
180 ME |
Group 1: Project assembly Group 2: Inspection |
|
|
13 |
01-May 03-May |
M W |
180 ME |
Group 1: Project assembly Group 2: Inspection |
Group 1: Assembly rpt due (G) Group 2: Inspection rpt due (G) |
Final Report is to be submitted by 08th May. Group 1 and Group 2 should submit the inspection report and the assembly report respectively along with the final report.
(I)
è Individual Assignments (G) è Group Assignments